line up-rates

Los Angeles Department of Water & Power corrects failing splices in record time!

On a recent Tuesday morning at 10:00, two linemen from LADWP, Mike Traweek and Sammy Sempelsz lifted off the ground in their new Altec bucket truck to begin the first round of ClampStar® installations. They completed the first 6 installations in 55…


ClampStar makes line up-rates possible!

Major Breakthrough With New Cost Saving Connector Technology Propels Classic Connectors, Inc. And Their Revolutionary Product “ClampStar®” Into Electric Utilities Must-Have Product For 2010 For the past several years, utilities have been under…


Dominion VA Power installs ClampStar in Grandy, NC

The unit was installed on a 477 ASCR conductor, 34.5kV L-L, 19.9kV L-N, over an automatic splice. Including the time for set up, and covering/uncovering the adjacent conductors, the install took 25:19. Once the ClampStar® was loaded in the bucket, the…


Introducing ClampStar from Classic Connectors

There is a serious problem in the electric power utility industry that is getting worse every day. Almost half of the installed infrastructure has reached the end of its original design life. Because the assessment and replacement of these components is…